摘要
This paper presents a multi-start simulated annealing with bi-directional shift timetabling (MSA-BST) algorithm for solving the no-wait jobshop scheduling problem (NWJSP). To enhance the quality of the solution, a bi-directional shift timetabling procedure that allows delay timetabling and consequently enlarges the search space is embedded into the multi-start simulated annealing algorithm. The performance of the proposed MSA-BST algorithm is evaluated with respect to the makespan by comparing its computational results to those of the best-to-date meta-heuristic algorithm, the hybrid artificial bee colony (HABC) algorithm, in the literature. Experimental results that were obtained by applying the proposed algorithm to a set of benchmark problems in the literature indicate that it significantly outperforms HABC. The main contribution of this study is to provide a novel and effective alternative method for solving the complex NWJSP.
| 原文 | English |
|---|---|
| 文章編號 | 106615 |
| 期刊 | Computers and Industrial Engineering |
| 卷 | 146 |
| DOIs | |
| 出版狀態 | Published - 8月 2020 |
文獻附註
Publisher Copyright:© 2020
指紋
深入研究「Solving no-wait job-shop scheduling problems using a multi-start simulated annealing with bi-directional shift timetabling algorithm」主題。共同形成了獨特的指紋。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver