跳至主導覽 跳至搜尋 跳過主要內容

Single machine scheduling problems with sequence-dependent setup times and precedence delays

研究成果: 期刊貢獻文章同行評審

4 引文 斯高帕斯(Scopus)

摘要

Sequence-dependent setup times and precedence delays occur frequently in various production environments. This study investigates the single machine scheduling problem with setup times and precedence delays that occur in an amplifier assembly company. This study proposes a novel mixed-integer linear programming model and a lean iterated greedy algorithm to minimize the makespan for this problem. Based on the property of delayed precedence constraints, the lean iterated greedy (LIG) algorithm uses a simple but effective lean construction mechanism that can discard infeasible solutions to reduce the waste of unnecessary searches and quickly converge to the (near) global optimum. The computational results show that LIG significantly outperforms the state-of-the-art algorithm in terms of solution quality and computational efficiency. This study mainly contributes to providing a simple, effective, and efficient algorithm that can facilitate industrial applications and serve as a new benchmark approach for future research.

原文English
文章編號9430
期刊Scientific Reports
12
發行號1
DOIs
出版狀態Published - 12月 2022

文獻附註

Publisher Copyright:
© 2022, The Author(s).

指紋

深入研究「Single machine scheduling problems with sequence-dependent setup times and precedence delays」主題。共同形成了獨特的指紋。

引用此