Skip to main navigation Skip to search Skip to main content

Use of support vector regression to improve computational efficiency of stochastic time-cost trade-off

Research output: Contribution to journalArticlepeer-review

20 Scopus citations

Abstract

Stochastic time-cost trade-off has been a popular object of investigation in past decades because there are uncertain factors that can be considered when determining the appropriate trade-off between project completion time and cost. Previous studies, however, have implemented a double loop procedure, which performs optimization in the outer loop and simulation in the inner loop. The double loop procedure is ponderous because it requires an unacceptably long computation time (taking hours or days), even for a small to medium project. The present study proposes an integrated system that converts the double loop to single loops,thereby dramatically reducing computation time. This is done by incorporating a support vector regression model to obtain a decision function, which will be used to replace the time-consuming Monte Carlo simulation to evaluate the objective function values for individual solutions. With the objective function values, a multiobjective particle swarm optimization algorithm is developed to search for the Pareto front composed of nondominated solutions. It has been empirically shown that the proposed system significantly outperforms the conventional double loop procedure because the former can consistently generate a better Pareto front (with a larger hyperarea ratio) hundreds of times faster by using much less computation time. The Student's t test is performed to validate the superiority of the proposed system. The contribution of the proposed system is multifold. First, improved computational efficiency is essential for the widespread acceptance of the stochastic time-cost trade-off analysis in practical applications. Second, with less computation time spent in simulation, efforts can be focused on the search for much better nondominated solutions. Third, the proposed system can incorporate the risk attitudes of the decision makers into the analysis by allowing them to specify the probability that they can tolerate for project duration (cost) to exceed a certain limit.

Original languageEnglish
Article number04013036
JournalJournal of Construction Engineering and Management
Volume140
Issue number1
DOIs
StatePublished - Jan 2014

Keywords

  • Cost and schedule
  • Metaheuristic
  • Multiobjective optimization
  • Particle swarm optimization
  • Support vector regression
  • Time-cost trade-off
  • Uncertainty analysis

Fingerprint

Dive into the research topics of 'Use of support vector regression to improve computational efficiency of stochastic time-cost trade-off'. Together they form a unique fingerprint.

Cite this