Skip to main navigation Skip to search Skip to main content

Thinking on the design practice of modern commercial complex taking hohhot jinyu new field project as an example

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

Abstract

The JinYu New Field Project is designed to build a large-scale center integrating business, culture, commerce, leisure and entertainment in the emerging development area in the south of Hohhot in the future. After three years of design and construction, the project begins to take shape. Through deep analysis of the commercial form, commercial space, land and traffic organization, fire performance of the commercial building and design difficulties of JinYu New Field Project, this paper summarizes the key points and difficulties of the commercial complex project in the design practice, and proposes the thinking on future development of the commercial complex in China.

Original languageEnglish
Title of host publicationContemporary Problems in Architecture and Construction
EditorsDarja Kubečková
PublisherTrans Tech Publications Ltd
Pages655-662
Number of pages8
ISBN (Electronic)9783038352372
DOIs
StatePublished - 2014
Event6th International Conference on Contemporary Problems of Architecture and Construction - Ostrava, Czech Republic
Duration: 24 Jun 201427 Jun 2014

Publication series

NameAdvanced Materials Research
Volume1020
ISSN (Print)1022-6680
ISSN (Electronic)1662-8985

Conference

Conference6th International Conference on Contemporary Problems of Architecture and Construction
Country/TerritoryCzech Republic
CityOstrava
Period24/06/1427/06/14

Bibliographical note

Publisher Copyright:
© (2014) Trans Tech Publications, Switzerland.

Keywords

  • Commercial space composition
  • Fire performance-based analysis
  • Functional pattern composition
  • Project overview
  • Project process
  • Traffic organization

Fingerprint

Dive into the research topics of 'Thinking on the design practice of modern commercial complex taking hohhot jinyu new field project as an example'. Together they form a unique fingerprint.

Cite this